Box, roll or metre prices: compare suppliers using the same unit
Convert pack prices and separate order quantity, job consumption and reusable leftovers before choosing a supplier.
A € 72 box is not necessarily more expensive than a € 50 box. Check the usable contents, the quantity required and what happens to the surplus. Compare a common base unit first, then calculate the complete packs you actually need to order.
This check supports construction estimating and purchasing. The examples are illustrative, exclude VAT and omit discounts. For a real purchase, use the supplier’s product specification, quotation and delivery terms.
Record three units explicitly
The purchasing unit might be a box, roll or pallet. The base unit might be a piece or metre. The selling unit in your estimate could differ again, such as a square metre of finished work. Store the conversion factor and its source with the price.
Do not place an unexplained 72 in an item record. Record € 72 per box, 24 pieces per box and € 3 per piece. A price without its packaging basis can distort future quotations even when the item description remains unchanged.
Check conversion factors before importing a new supplier price list — and never silently rewrite historical accepted estimates.
Compare the actual order as well as the unit price
A job needs thirty identical connectors. Supplier A sells boxes of 24 for € 72. Supplier B sells boxes of 20 for € 64. Their base prices are € 3 and € 3.20 per piece.
If only complete boxes can be purchased, A requires 48 pieces costing € 144. B requires 40 pieces costing € 128. A has the lower unit price, while B requires less cash for this particular order. Add delivery charges and minimum-order conditions before deciding.
With A, the thirty pieces consumed represent € 90 at purchase cost. The eighteen remaining pieces represent € 54. If those pieces can be reused, record their storage location. Whether the job bears consumed units or the full pack purchase depends on your consistent internal costing method. Make that choice visible.
Rolls introduce a separate waste question
A 25-metre roll costing € 80 has a base price of € 3.20 per metre. If the job needs 18 metres of useful length and produces 2 metres of cutting waste, consumption is 20 metres, worth € 64. The remaining 5 metres is worth € 16 if it can still be used.
A drawing quantity is therefore not automatically the purchasing or consumption quantity. Show cutting waste explicitly. Avoid including the same waste factor in both the quantity and another uplift. Recheck conversions whenever a supplier changes pack contents.
Check price-list entries before accepting them
Confirm the exact reference, size and specification. Establish whether the price is per item, pack or hundred items. Check pack contents, gross versus net pricing, discounts and freight. Finally, establish whether leftover stock will actually be usable and traceable.
A matching item name does not prove technical equivalence. Have the specification checked before choosing the cheaper option. A lower price provides no saving if the product cannot be used for the intended application.
Correct future data without rewriting history
Preserve the original unit and conversion factor in existing estimates. Update future prices after review and examine open quotations separately. Correcting purchasing data does not automatically change an agreement with a customer.
The broader supplier price library guide covers organising those records. For an Enfin demonstration, bring an anonymised box-price line and roll-price line. Follow them through purchasing, estimating and consumption. The useful result is a conversion that both the buyer and estimator can explain without maintaining a private spreadsheet alongside the process.
Using GPS Tracking for Construction Site Attendance and Planning
Learn how simple GPS check‑in/out can improve attendance records, project planning and invoicing for Belgian construction SMEs while complying with privacy rules.
Declaration of Works for concrete suppliers: record the branch without falsifying the subcontractor chain
Belgium's Declaration of Works process recognises a practical problem in ready-mixed concrete deliveries: the exact delivery subcontractor may not be known…
Managing Construction Suppliers in Belgium: Order to Payment
Control Belgian construction purchasing with supplier records, order matching, project evidence, payment approvals and current subcontractor checks.