Create a construction quote with Alfie from voice after reviewing scope and exclusions
Turn a spoken site request into a bounded quote draft only after customer, work scope, units, options, exclusions and VAT are checked.
Voice is fast on site, but a short request often omits quantities, finish levels, access constraints or who supplies materials. A polished quote must not hide those gaps behind confident wording.
Resolve the real construction record
The current Alfie product page positions Alfie as Enfin's construction execution layer. Current application source registers create_offer and classifies this workflow as low risk with commercial consequences. This article claims no external integration, autonomous outcome or roadmap capability.
Review one bounded proposal
Resolve the customer and site, structure the requested work into reviewable lines, and show units, quantities, prices, options, exclusions, validity and VAT treatment. Ask for the one missing fact that changes the commercial promise.
Separate preparation from execution
Keep the transcript and reviewed structure with the draft. Creating the quote does not email it, mark it accepted, schedule a reminder or start a project. Each next step needs its own current record and confirmation.
Test ambiguity and recovery
Test the workflow with a missing identifier, two records sharing a name, stale source data, insufficient rights and a temporarily unavailable service. Alfie should ask one focused question or leave an unexecuted proposal. A plausible guess is not a safe substitute for the exact customer, project, quote, document, amount or date.
Repeat the review when a party, amount, scope, schedule, recipient or document version changes. Earlier consent is context, not standing permission. Store the request, selected record, useful source fields, user, timestamp, confirmation state and final result without copying unrelated personal or payment data.
Make recovery visible. A colleague who did not prepare the action should be able to reconstruct what was known, which uncertainty remained, what was proposed and whether it was confirmed, executed, rejected or blocked. Define who may correct a mistake and which related quote, project, planning or invoice records need another check.
Run a second-person test before relying on the workflow every day. Change the project, document version or date while a proposal is pending; the old proposal should no longer be executable. This keeps AI interpretation useful while Enfin remains the governed execution layer around identity, permissions, confirmation and audit history.
Keep the commercial path connected
Enfin connects CRM, quotes, projects, planning, tasks, costs and invoicing in one Belgian construction record. Alfie can interpret that context and prepare registered actions within the user's permissions; consequential steps remain reviewable and confirmable. Explore Alfie, compare pricing or discuss your workflow.
Create a construction invoice with Alfie after reviewing quote lines and VAT
Check the customer, accepted quote, invoice lines, dates and VAT treatment before preparing one traceable construction invoice.
Add project items with Alfie after reviewing the site instruction and scope
Turn a site instruction into reviewed project items without confusing requested work, approved scope, cost ownership or invoice readiness.
Construction quote assumptions and exclusions: make the scope executable
Turn assumptions, provisional choices and exclusions in a Belgian construction quote into clear ownership before acceptance.